The last parts for the Mounting prongs were added last night. Then it was on to detailing the upper hull.
The detailing strips were cut from evergreen styrene with a NWSL chopper to ensure they were all exactly the same and then glued onto the hull.
I also decided to add strengthening webs to the end hatch using small triangles cut from styrene strip.
I am fairly pleased how this came out and I think it adds that little extra level of detail that offsets the rest of the end part.
The cryotube arches and associated details are now ready to be added and this project is getting close to going to the paint shop.
More soon,
Cheers,
Friday, October 14, 2011
Subscribe to:
Post Comments (Atom)
Harrah's Cherokee Casino - Travel | MJH
ReplyDeleteVisit Harrah's 오산 출장샵 Cherokee Casino, 대구광역 출장샵 just 30 minutes 제주도 출장안마 from North Carolina. Featuring slot 서울특별 출장안마 machines, table games, live entertainment, 태백 출장샵 poker, blackjack,